Professional Demolition

Residential Demolition in Toronto — Safe, Permitted, and On-Schedule

Engineer-guided demolition to OBC 2024 (in force Jan 1, 2025) with demolition permits calculated by Toronto's official schedule ($0.17/m², min $206.53). Utilities safely disconnected(Hydro/ESA, Gas, Water) and One Call locates handled.

WSIB Clearance
Licensed & Insured
Engineer-Stamped
4.8★ Google
Disposal Tickets Provided

Toronto house demolition done right: permits secured, designated substances addressed, utility disconnections coordinated, right-of-way managed, and neighbors kept informed under the City's noise rules. We include demolition-permit fee math up front so there are no surprises.

Mon–Fri 8:00–18:00 • Demolition within noise by-law hours (Mon-Fri 7:00-19:00, Sat 9:00-19:00)

Quick Demolition Estimator

Get instant permit fees and disposal estimates based on Toronto's 2025 rates

Total floor area to demolish

Planning tool only. Site visit required for accurate quote.

What You Get With DemoBulls

Complete demolition services with full permit compliance, safety protocols, and transparent pricing

Fully Permitted Demolition

Complete permit preparation and filing

City fee math shown: SI $0.17/m²; min $206.53; Environmental Review if applicable

Safety First (OHSA)

Construction Projects compliance

NOP filed when required; crews trained on asbestos/designated substances

Utilities & Locates

All disconnections coordinated

ESA/Toronto Hydro permanent disconnect, gas, water, and Ontario One Call locates

Right-of-Way & Neighbors

Street permits and noise compliance

Street Occupation permits for bins/hoarding; work within Noise By-law hours

Transparent Disposal

Tonnage estimated and tracked

City depot fees shown ($183/tonne garbage; $137.25/tonne recycling); haul tickets provided

Full House Demolition

Complete structure removal

Foundation to roof, including garages and sheds

Selective Demolition

Interior strip-out or partial removal

Keep shell intact while removing specific areas

Asbestos Abatement

O. Reg. 278/05 compliant

Type-rated work with proper containment and disposal

Site Clearing & Backfill

Ready for new construction

Cap services, rough-grade, and fence as required

Our Work in Action

Kitchen Demolition

Kitchen Demolition

Concrete Demolition

Concrete Demolition

Asbestos Removal

Asbestos Removal

Site Cleanup

Site Cleanup

Our 8-Step Demolition Process

From initial assessment to final inspection, every step is engineered for safety and compliance with Ontario regulations

01

Site Visit & Measurements

Verify access, neighbor proximity, overhead lines

Assess trees, right-of-way needs, and structural complexity

02

Designated Substances & Asbestos

Arrange DSS/asbestos survey as needed

Plan abatement per O. Reg. 278/05; include dust control plan

03

Method & Engineering

Professional Engineer review where required

Buildings >3 storeys, >600m², or special structures need P.Eng stamp

04

Permits & Approvals

Demolition permit, Street Occupation, Urban Forestry

Heritage clearance where applicable; ~10 business days for permit

05

Utilities & Locates

Coordinate all disconnections

Hydro/ESA permanent disconnect, gas, water; Ontario One Call locates

06

Selective Strip-Out & Abatement

Remove HVAC, plumbing, finishes

Complete Type-rated asbestos work; segregate recyclables

07

Structural Demolition & Load-Out

Sequenced demolition per OHSA

Maintain hoarding/ROW controls; respect noise hours; haul to approved facilities

08

Backfill & Close-Out

Cap services, rough-grade site

Final City inspection to close permit; deliver WSIB Clearance and disposal records

Safety & Compliance at Every Step

OHSA Construction Projects

All work follows Ontario's strict demolition safety regulations

Notice of Project

e-NOP filed where required; IHSA demolition guidance followed

Designated Substances

Owner duty s.30 compliance; asbestos per O. Reg. 278/05

The Demolition Process

Interior Demolition

Interior Demolition

Drywall Removal

Drywall Removal

Waste Disposal

Waste Disposal

Clean Site Ready

Clean Site Ready

Safety First, Always

WSIB cleared, OHSA compliant, and fully insured. Your safety and property protection are our top priorities.

PPE Compliance

PPE Compliance

Full personal protective equipment on every site

Site Safety

Site Safety

Comprehensive safety protocols and procedures

Dust Control

Dust Control

Professional containment from ceiling to floor

Floor Protection

Floor Protection

Complete floor covering during all demolition work

Complete Site Cleanup

We don't just demolish—we ensure your site is perfectly clean and ready for the next phase of construction.

  • Vacuum cleaning of all surfaces
  • Power washing when required
  • Complete debris removal and disposal
  • Site ready for immediate renovation
Vacuum CleaningPower WashingClean SiteReady for Renovation

Permits & Compliance Made Simple

We handle all permit requirements and ensure full compliance with OBC 2024/25 and City of Toronto regulations

Demolition Permits (Toronto Building)

Permit Fee Structure:

  • SI × Area: $0.17 per m²
  • Minimum Fee: $206.53 (2025)
  • Environmental Review: $991.34 (when applicable)

What We Handle:

  • • Complete application preparation
  • • Engineering coordination (where required)
  • • Environmental Building Audit & dust control plan
  • • Inspection scheduling (~2 business days)
  • • Final inspection for permit closure

Timeline: Ontario targets ~10 business days for permit decision on complete submissions.

Additional Permits & Approvals

Street Occupation Permit:

  • Required for bins/hoarding on street
  • Sidewalk/road occupation
  • Traffic management if required

Other Approvals:

  • Urban Forestry: Chapter 813 tree protection
  • Heritage: If listed/designated property
  • Utilities: ESA/Hydro disconnect permits

Note: We coordinate all necessary permits and approvals based on your specific project requirements.

Full Regulatory Compliance

OBC 2024

Demolition to Ontario Building Code 2024 (in force Jan 1, 2025)

WSIB & OHSA

Expanded compulsory coverage; Construction Projects compliance

Designated Substances

Owner duty s.30; asbestos per O. Reg. 278/05

Noise By-law (Chapter 591):

Construction hours: Mon-Fri 7:00-19:00, Sat 9:00-19:00. No work Sundays or statutory holidays.

Inspections:

Toronto targets within 2 business days of request. Final inspection required to close permit.

Frequently Asked Questions

Get answers to common questions about demolition in Toronto

Yes. Toronto issues demolition permits with fees calculated by SI $0.17/m², subject to minimum $206.53 (2025). Some jobs include Environmental Review at $991.34 additional. We handle all permit preparation and filing for you.

Ontario's service standard targets 10 business days for a house, assuming a complete submission. Complex projects or those requiring environmental review may take longer. We ensure your application is complete to avoid delays.

Toronto targets within two business days after you request. You must schedule the final inspection to close the permit. We coordinate all inspection scheduling as part of our service.

Owners must provide a designated substances list (OHSA s.30). Asbestos is governed by O. Reg. 278/05. The City's demolition checklist may require an Environmental Building Audit including dust control plan before permit. We arrange all necessary surveys and abatement.

Yes—ESA/Toronto Hydro permanent disconnection, gas coordination, and water termination are all arranged prior to demolition. We handle all utility coordination to ensure safe disconnection before work begins.

Typically Mon–Fri 7:00–19:00, Sat 9:00–19:00, no Sundays/statutory holidays. We schedule all demolition work within these hours and notify neighbors in advance.

Yes—if any portion of sidewalk or road is occupied, we obtain a Street Occupation Permit. This covers bins, hoarding, and any staging equipment that extends beyond your property line.

We coordinate Urban Forestry permits under Chapter 813 for protected trees and apply for Heritage Permits if the property is listed, designated, or in a Heritage Conservation District.

A typical 2-storey house (150-200m²) generates 15-25 tonnes of waste. Wood frame structures produce less; masonry structures produce more. We provide actual weigh-scale tickets after hauling.

Our quotes include: permits and fees, utility disconnections, designated substance surveys, demolition labor and equipment, disposal and tipping fees, site cleanup and rough grading, WSIB clearance certificate, and all disposal documentation.

Yes, we offer selective demolition for interior strip-outs, partial removal, or keeping the shell intact. This is often faster to permit and generates less waste, making it more cost-effective for renovations.

We cap all services properly, rough-grade the site, install temporary fencing if required, and ensure the final City inspection is passed to close the permit. The site is left ready for new construction.

Ready to Start Your Demolition Project?

Get a free site assessment and transparent quote with all permit fees included

Call 437-545-0067

Ready to Demolish Safely and Cleanly?

Get your demolition project started with Toronto's trusted contractor

Permitted & WSIB-Cleared Utility-Safe Neighbor-Friendly

With City permit fee math included up front

Skip to main content